Knowledge library
Search the ASTT technical archive.
Papers, case studies, standards and webinars covering trenchless methods across Australia and New Zealand.
459 results (298 ASTT documents, 161 ISTT technique descriptions) · showing 241–264
Safety Measures for Reducing Asset Strikes
With the rapid expansion in HDD use, there has been a responding increase in safety incidents. 3rd party safety issues, in particular damage to crossing utilities in the bore path, will become a much bigger issue for drillers. Utilities and lead contractors are becoming more focused on this issue and liability issues…
Ed George · 2017
The Economical and Environmental Benefits of Slurry Waste Handling
Improper handling of HDD slurry waste and construction fluids can result in operational downtime, expensive disposal costs due to liquid waste hauling and a negative environmental impact. BOS Solutions specializes in on site, solids and liquid separation of any mud or slurry type. By utilizing our new technology and…
Craig Jones · 2017
Trenchless Technology Used to Understand Risk Under New Major Road
Managing buried assets and risk is becoming more optimised with the advent of trenchless technologies to assess their condition. The Queensland Department of Transport and Main Roads has recently utilised innovative technologies and techniques to help understand the condition of a critical buried water main, to assess…
Roberto Mascarenhas, Nicole Smart · 2017
Trunk Main Rehabilitation using a Kevlar Reinforced Composite Lining System
The paper presents a flexible Kevlar® reinforced lining solution for the trenchless rehabilitation of critical water main infrastructure. The paper will show the composition of the lining material as well as the functionality of the specifically developed termination fittings. The lining material is characterized by…
Mark Trembath, Andreas Gross · 2017
Using GPR technology to increase safety and reduce equipment damage and site risks
This paper will highlight the new advances in Ground Penetrating Radar (GPR) technology and software processing which complement traditional Electromagnetic (EM) utility locating methods. GPR allows for mapping of abandoned utilities as well as metallic and non-metallic utilities. Using case studies, we will show new…
Stuart McCurdy, Reuben Barnes · 2017
Using the Versatility of the CIPP System to address challenges
It is a well-known fact that Cured in Place Pipe (CIPP) Lining is a trenchless methodology for the rehabilitation of deteriorated pipes and that it can extend the design life of the rehabilitated assets by at least 50 years. But the CIPP system is much more than that. There are wide choices of resins with different…
Zuhair Shehadeh, Ammar Ahmed · 2017
”Why Clean Clean Pipes ?” Sydney Water Trial of SL-RAT
”Why Clean Clean Pipes ?” Sydney Water Trial of SL-RAT The SL-RAT is a new innovative technology introduced to the Australasian market by Austeck Pty Ltd in 2014 and developed by Infosense Inc in the USA. The SL-RAT sends an acoustic tonal pulse down the pipe and in less than 3 minutes makes a blockage assessment and…
Steve Barclay, Virginia Cheng · 2015
13 Years of Delivering Trenchless Technology on Sydney Water's Priority Sewerage Program
Tino Ferrero · 2015
Advanced Geopolymer Pipe and Structure Lining Systems
Asset owners and engineers throughout the U.S. and the world are in search of cost-effective and environmentally friendly solutions that serve infrastructure issues. One of the most critical areas of concern is wastewater piping and structures. It is well known that corrugated metal pipes used in storm-water…
J.R. Royer, Mark Mauro, John M. Hepfinger · 2015
Advancements in Non-Destructive Technologies for Pipeline Condition Assessment
Risk based asset management is a key principle behind Queensland Urban Utilities’ management of its critical assets, which involves identifying the current condition of assets and understanding the risk of failure. This enables selective repair or replacement to extend asset life and defer capital expenditure beyond…
Roberto Mascarenhasand Jonathan Farrell · 2015
ASTT Specification for Horizontal Directional Drilling
2015
ASTT Specification for Microtunneling and Pipe Jacking
2015
ASTT Specification for Pipe Bursting
2015
ASTT Standard for Horizontal Directional Drilling
2015
ASTT Standard for Microtunnelling & Pipe Jacking
2015
ASTT Standard for Pipe Bursting
2015
Case Study: Horizontal Directional Drilling (HDD) Hydrofracture and Pipe Installation Load Analysis, Prediction VS Actual
Inadvertent drilling fluid returns is one of the most significant issues for HDD operations due to the potential effect it can have on the environment, the integrity of the borehole and the ability to remove cuttings from the borehole. These issues can seriously impact on the overall success of a pipe installation via…
Adam Shayler, Jiang Aizezi · 2015
Case Study: Jacking Force of Curved Pipejack (Prediction VS Actual)
Jacking force is a critical element of a pipejacking operation. It influences the length of the tunnel drive, pipe integrity, and location of the shafts and utilisation of Intermediate Jacking Stations. Thus, it has strong impact on the constructability and end use of the pipejacking operation. Therefore, it is…
Ben Crosby, Jiang Aizezi · 2015
Case study: Warragul Trunk Sewer
The Warragul Trunk Sewer project was part of the $A13 million Warragul works undertaken by Gippsland Water to improve sewerage systems within the region. Approximately 1,5000m of microtunnelling was utilized during the project, which connected residential properties to a central sewer system. This paper seeks to…
Stuart Harrison · 2015
Challenging installation of large diameter HDPE pipe by directional drilling provides a comprehensive water management solution and an improved environmental outcome
This presentation describes the Chichester project and outlines the exceptional capability of the Australian PE pipe industry to deliver value to asset owners. After 85 years of operation, the pipe owner, Hunter Water, decided to replace the above ground 900mm metal pipe line that had been prone to flood damage and…
Gerald Beckton, Campbell Thomas, Predrag Micic · 2015
CIPP: An Alternative Method for Rehabilitating Asbestos Cement Pressure Mains
Lutz Kaiser · 2015
Comparison Between Rectangular Shield Jacking and Pipe Roof via Case Studies
The paper will discuss and share the knowledge/experience in the application of rectangular shield jacking method via case study. It will highlight that the basic concept of design, construction and machine manufacture through projects which had been carried out in China and Singapore. Meanwhile, the comparison…
Trisha Sun · 2015
Comparison of Liner Design Codes in Europe and Abroad
The actual German design code DWA-A 143-2:2015 differentiates between four Host Pipe States: State I (sewer untight; no cracks), State II (sewers with longitudinal cracks; soil pipe system stable), State III (cracked sewer with large deformations; considerable risk to failure in the near future) and State IIIa (sewer…
Bernhard Falter · 2015
Complexities in Stormwater Rehabilitation in the City of Gold Coast
Abergeldie Watertech Pty Ltd was contracted on behalf of Gold Coast City Council to rehabilitate a large number of tidally affected stormwater mains ranging from 300mm up to 1500mm in diameter. The utilisation of trenchless technology has been at the forefront of stormwater rehabilitation in the surrounds of Gold…
Jonathan Tat · 2015
