Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Trunk Main Rehabilitation using a Kevlar Reinforced Composite Lining System
Library
MembersPaper2017

Trunk Main Rehabilitation using a Kevlar Reinforced Composite Lining System

Mark Trembath, Andreas Gross

Abstract

The paper presents a flexible Kevlar® reinforced lining solution for the trenchless rehabilitation of critical water main infrastructure. The paper will show the composition of the lining material as well as the functionality of the specifically developed termination fittings. The lining material is characterized by high material strength, accommodating the operating pressures independently from the host pipe material. At the same time, the lining material has a low wall thickness of 6 – 8 mm for PN 16, reducing the cross-sectional losses significantly comparision to sliplining with HDPE SDR 11 PN 16. Due to the flexibility of the Kevlar® reinforced lining material, bends of up to 90 degree can be traversed and thus, long installation lengths of several hundred meters in one step a feasible. The paper will address needed cleaning and equipment requirements as well as the installation process. The paper will present a case study on the rehabilitation of a DN 225 Class 9 PVC trunk water main with a length of 460 m for the Lismore City Council using the Kevlar® reinforced lining system. The Council was confronted with multiple burst on this line. The following technical goals were to be realized with the proposed rehabilitation solution: upgrade the existing Class 9 PVC pipe to PN 16 and minimize the cross-sectional losses. In addition, a scour valve had to be reinstated. The paper will conclude with the advantages and limitations of this lining system.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Inserted Hose

Citation

Mark Trembath, Andreas Gross (2017). Trunk Main Rehabilitation using a Kevlar Reinforced Composite Lining System. Paper presented at No-Dig Down Under 2017. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2017
Pages:
9
File:
PDF, 1.1 MB

One-page brief

Member companies

Corporate members delivering Inserted Hose

WCWitt ConsultingTunnel design and rehabilitation specialistsWCWaipa Civil3 waters trenchless and open cut 3 waters.Kellogg Brown & Root Pty LtdPipeline design and rehabilitation