Collar Suitability and Joint Deflection for MTBM Tunnelling
Appropriate jacking pipe collar selection can significantly influence the outcome and success of a microtunnelling project. Significant forces and loadings are experienced at the joints along a pipeline during installation which are subsequently experienced by the jacking pipe collar. Poor collar selection can lead to…
J King · 2022
Condition assessment and rehabilitation of deteriorated buried pressure water pipes using MPEP
Assessing the levels of deterioration of buried pipelines is a significant asset management problem for most water utilities. The lack of asset condition information, particularly for old reticulation mains, compounds this problem, forcing utilities to adopt a reactive maintenance approach for their ageing assets. We…
Benjamin Shannon, Ravin Deo, Guoyang Fu, Rukshan Azoor, Jayantha Kodikara · 2022
Condition Assessment Outputs - What Do They Mean
Condition assessment of pressure water and sewer mains has become increasingly important over the past 20 years. Nowadays, there are several service providers offering a range of technologies, with varying outputs. This paper discusses some of the outcomes derived from a range of technologies, including acoustic…
Philip Ferguson, Matthew Tai · 2022
Design of Enveloper Pipe Installations and To Grout or Not to Grout
The design requirements of enveloper pipe installations, or what is sometimes called a “pipe in a pipe”, often causes confusion among designers, installers, and asset owners alike. Often the design intent or purpose of the enveloper is not understood and there is confusion as to whether it is part of the temporary or…
John Bower, Rob Tredger · 2022
Direct Pipe Down Under – Recent Success and Opportunities
Direct Pipe® (DP) was first introduced to the world in late 2007 with a 464m crossing beneath the Rhine River. Although still considered a new technology, as of March 2021, over 160 DP crossings have been completed globally with the popularity, and range of applications, growing rapidly since 2015. But what is Direct…
Brent Whiting, Dominic Preest, Justin Shepherd · 2022
Direct Pipe in Three Case Histories- Overcoming Challenging Ground and Site Conditions
Direct Pipe® (DP) is a relatively new trenchless technology by which a steel pipe is installed in compression through curves and sometimes tangent sections. The ground in the heading of the pipe is excavated through conventional microtunneling methods while a Pipe Thruster machine provides the motive force. Once the…
Robison, Campos · 2022
Effects of temperature on material properties in spray and cured-in- place-pipe liners
Temperature plays a vital role in estimating the long-term properties of spray and CIPP liners, which are examined for relining deteriorated water pipes. Temperature variation in pipelines should be known prior to installation of any polymer-based pipe or liner. This ensures that long-term properties can be assessed…
Benjamin Shannon, Guoyang Fu, Jayantha Kodikara · 2022
End-to-end Pipeline Asset Management
Ivan Beirne, Brian Pilkington, Thuy Lam · 2022
Evaluation of One-Part Geopolymer Mortars as Protective Sewer Coating for Sewer Assets
This study evaluated the suitability of various commercially available geopolymer mortars (GP) for application in a sewer environment. Corrosion of one-part geopolymer mortars was compared with commercially available calcium aluminate cement through a series of accelerated corrosion and field tests. Accelerated…
Cherdphong Seedao, Ye Jun In, Matthew Fisher, James Gardner, Marjorie Valix · 2022
Fibreglass Future – GRP Maintenance Structures on Large Gravity Sewers
Maintenance structures (or “manholes”) play an essential role in helping keep sewerage systems running. They enable the owner of the sewer to access, inspect and maintain a sewer throughout its asset life. Over the past 10 years, Melbourne water retailer Yarra Valley Water has embraced the use of glass-reinforced…
Orry Thomas, Keith McGovern · 2022
GeoKrete – A Geopolymer Pipe Rehabilitation System
GeoKrete is a geopolymer mortar liner for raw, storm and wastewater infrastructure rehabilitation. For rehabilitation of existing aged assets that have reached, or are nearing end of design life, it is an alternative that can provide a far more cost effective solution than complete replacement. AquaMetro has partnered…
Ashley Sharples · 2022
Geology and Trenchless Technology
Even though there are significant benefits in utilising Trenchless Technology for the installation of new pipelines it brings its own set of challenges and risks that need to be appropriately managed for a successful outcome. One of the major risks with the use of any trenchless technology is the geology. To be able…
Adam Shayler · 2022
Hawthorn Main Sewer Rehabilitation
Melbourne Water Capital Delivery Program (SFPJV) · 2022
Innovation in trenchless rehabilitation of potable water lines - SAERTEX-LINER H2O
In 2019, SAERTEX multiCom was awarded with the ISTT NO-Dig Innovation award in the category of “UV curable GRP Liner for the trenchless rehabilitation of potable water lines” for their SAERTEX-LINER® H O. 2 This product, made in germany, is produced by SAERTEX multiCom GmbH a manufacturer of UV-cured…
Katharina Helming · 2022
Management of AC Pipes Now and Into the Future
Abstracts should be limited to 250 words maximum. Water Services Association of Australia (WSAA) commenced investigation of issues associated with Asbestos Cement (AC) pipes in the 2010/2011 WSAA Asset Management Program. Stage 1 (2013) quantified the length of inservice AC water mains at 40,000km costing between $8.9…
Steven Nash, James Goode, Mike Stokes · 2022
Minimum Performance Requirements of HDPE Pressure Pipes
Product and installation standards for HDPE pressure pipes have been established to ensure a target design life of at least 50 years under typical application conditions. It is essential that all actors involved in pipe value chain have a basic understanding of the minimum performance requirements listed in the…
Jeroen Wassenaar, Predrag Micic · 2022
Miracles of St Marys Bay Water Quality Improvement Project
In January 2020, McConnell Dowell Constructors (MCD) commenced the St Mary’s Bay Water Quality Improvement Project on behalf of Auckland Council Healthy Waters (ACHW). The project involved the construction of 1,125m of 1.8m ID storage tunnel, which was designed to intercept 3 existing Combined Sewer Outfalls. These…
Matt Beswick, Karun Kumar · 2022
Mountain Highway AC Water Main Renewal – Demonstration of a New Trenchless Alternative
Like Water Utilities throughout Australia, South East Water in Victoria has asbestos cement water mains in its distribution network that are reaching the end of their service life. South East Water’s 1,600 kilometres of AC mains were mostly laid in the 1950’s and 1960s, and like other Water Utilities, were mostly in…
John Monro · 2022
Northern Interceptor Pipeline Project
The amount of wastewater being collected and treated has increased significantly as Auckland’s north-west residential regions have expanded. To cater for this future growth in Auckland and free up exiting Wastewater Treatment Plants, the NZ$108 million Northern Interceptor wastewater pipeline was proposed in order to…
John Stuart-Robertson · 2022
Performance of cured-in-place-pipe lined cast iron pipes with circumferential defects under internal pressure
Circumferential defects may exist in deteriorated cast iron pipes before or after lining with cured-inplace-pipe (CIPP) liners. These defects may be in the form of gaps or failed joints and they may significantly influence the performance of the lined pipes under service conditions. However, limited research was found…
Guoyang Fu, Benjamin Shannon, Jayantha Kodikara · 2022
Pipe Jacking innovations for E-Power Pipe and small diameter Direct Pipe
Herrenknecht AG · 2022
Shaft Construction
Abstracts should be limited to 250 words maximum. Shaft construction Ground conditions Risk management Temporary to permanent works Shafts are needed on most trenchless construction projects, and they need to be treated with the same level of attention as other parts of the project. Shafts can be a major expense and…
Trevor O Shannessy, Barnabas Ilko · 2022
Smart Linings for Pipe and Infrastructure
The Smart Linings for Pipe and Infrastructure Project researched the effectiveness of pipeline liners focusing on four product categories: cured-in-place pipe liners and polymeric spray liners for water mains, and calcium aluminate cement mortars and alkalai activated binders (including geopolymer cement mortars) for…
James Gardner · 2022
Specification: Design for Structural Renovation of Pipelines by Internal Lining
ASTT SIG · 2022