Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Very Long HDD Crossings: 5 km? 10 km?
Library
MembersPaper2015

Very Long HDD Crossings: 5 km? 10 km?

Andrew Lukas

Abstract

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Horizontal Directional Drilling (HDD)

Citation

Andrew Lukas (2015). Very Long HDD Crossings: 5 km? 10 km?. Paper presented at No-Dig Down Under 2015. ASTT Knowledge Library.

Details

Source:
No-Dig Down Under 2015
Pages:
40
File:
PDF, 2.4 MB

One-page brief

Member companies

Corporate members delivering Horizontal Directional Drilling (HDD)

J&R Contracting LimitedDirectional Drilling Open TrenchingWCWaipa Civil3 waters trenchless and open cut 3 waters.WNZWSP New Zealand LtdFrom mountains to sea, our water experts design innovative solutions and train our industry to deliver sustainable solutions and enhance the health of water across New Zealand.
See all 64 members delivering Horizontal Directional Drilling (HDD) →