Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Vacuum Microtunnelling: Creating a New Trenchless Horizon
Library
MembersPaper2025

Vacuum Microtunnelling: Creating a New Trenchless Horizon

Stuart Harrison

Abstract

Vacuum microtunnelling is reshaping the future of pipeline installation. Traditionally, trenchless methods have been reserved for specialist crossings, while open cut dominated broader pipeline works. However, advances in systems like AdaptX and modified AXIS machines — which combine the use of vacuum extraction to create high-performance microtunnelling — are now tipping the scales. This paper explores how vacuum microtunnelling technology has evolved and is now expanding the capabilities of trenchless technology, delivering cost competitiveness with open cut at depths beyond five metres in greenfield environments, and at even shallower depths where excavation complexity increases, as is typically the case in urban settings. It highlights how trenchless construction can now offer superior accuracy, speed, and minimal ground disruption across a wider range of projects. Drawing on field data, equipment testing, and project comparisons, the paper demonstrates why trenchless methods should increasingly become the default choice for gravity sewer pipeline installation. It also examines how this shift is giving contractors greater confidence to invest in advanced trenchless equipment, knowing that trenchless construction will capture a growing share of future infrastructure work. By embracing vacuum microtunnelling, the industry can deliver better outcomes with less environmental and community impact. As specifications and procurement frameworks incorporate recent performance data, the share of trenchless installations is likely to grow. This paper outlines the evidence to support that transition with confidence.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Pipe Jacking / Microtunnelling

Citation

Stuart Harrison (2025). Vacuum Microtunnelling: Creating a New Trenchless Horizon. Paper presented at No-Dig Down Under 2025. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2025
Pages:
8
File:
PDF, 625 KB

One-page brief

Member companies

Corporate members delivering Pipe Jacking / Microtunnelling

Systra ANZSystra are underground engineers providing multi-disciplinary services to the transport, infrastructure, energy, utilities and mining sectors. We bring confidence to significant project decisions in a challenging delivery environment. In the trenchless space our services encompass consulting, clientOptionX GroupJ&R Contracting LimitedDirectional Drilling Open Trenching
See all 58 members delivering Pipe Jacking / Microtunnelling →