Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Taking Advantage of Pipe-String Buoyancy During Long and Difficult HDD Installations
Library
MembersPaper2015

Taking Advantage of Pipe-String Buoyancy During Long and Difficult HDD Installations

Todd Randell

Abstract

Horizontal Directional Drilling (HDD) is one of the oldest ‘new installation’ trenchless technologies in use today and continues to rapidly grow and develop. HDD contractors are successfully completing ever-longer and evermore-challenging bores when installing water and wastewater pipelines. This is a function of the continual advance in technology, plant and equipment, installation practices, and correct product pipe material selection. The combination of thorough planning, detailed design and continual advance in technology has provided contractors with the tools to reduce pull forces during pull back and increase the scope of the installation method. Pipeline buoyancy mitigation is the key component that can reduce pullback forces for longer installations and eliminate critical collapse concerns for deeper installations. Product-pipe material evaluation, combined with successful water-ballasting of the pipe-string during the pull-back process contributes to a reduction of pipe to borehole friction and thereby lowers pull force. This may result in a smaller outside diameter pipe selection, thinner pipe walls required, smaller HDD rigs and less plant and equipment employed, and all of these may reduce the capital cost of construction to complete some of these very difficult installations. This paper will discuss the merits of ballasting pipe strings during the pull-back process for HDD installations. It will take a close look at the mechanical properties of the most popular modern thermoplastic materials for use in HDD and will review case studies of difficult installations completed in North America and New Zealand with the aid of buoyancy modification. 1.5 - 1

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Horizontal Directional Drilling (HDD)

Citation

Todd Randell (2015). Taking Advantage of Pipe-String Buoyancy During Long and Difficult HDD Installations. Paper presented at No-Dig Down Under 2015. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2015
Pages:
11
File:
PDF, 1.4 MB

One-page brief

Member companies

Corporate members delivering Horizontal Directional Drilling (HDD)

WNZWSP New Zealand LtdFrom mountains to sea, our water experts design innovative solutions and train our industry to deliver sustainable solutions and enhance the health of water across New Zealand.Kellogg Brown & Root Pty LtdPipeline design and rehabilitationWCWaipa Civil3 waters trenchless and open cut 3 waters.
See all 58 members delivering Horizontal Directional Drilling (HDD) →