Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Rufi Hydropower Plant - Latest Technology Enables Large Diameter Curved Microtunnel Below Railways
Library
MembersPaper2017

Rufi Hydropower Plant - Latest Technology Enables Large Diameter Curved Microtunnel Below Railways

Cyrill Althuser, Markus Rennen

Abstract

Using a recently completed penstock of a hydropower project in Switzerland as an example, this paper shows the capabilities of today's technologies regarding curved microtunneling. In highly permeable coarse gravel with boulders, a 1770 ft long, 126 inch inner diameter / 150 inch outer diameter pipe had to be pushed in a 3D compound S-curve alignment with radii as small as 920 ft. The pipe line had to cross under existing infrastructure like a sewer line, railway line and an old arch channel with an overburden of partly as low as 2 ft. As the railway line remained operational throughout the under passing of the TBM, a geodetic monitoring system was installed providing continuous information about induced deformation as well as horizontal and vertical displacement. On the last part of the drive the machine was steered steeply upwards to minimize the depth of the receiving pit and therefore the dewatering systems resulting in significant cost savings. VMT's "SLS-Microtunneling LT" navigation system ensured the proper alignment. The 920 ft radius was done using 9.8 ft long pipes. This was accomplished by the application of the Jackcontrol® Hydraulic Joint (Jackcontrol® System), which allows large joint rotation angles without reduction of jacking forces. On this drive, the gap between the pipes on the inside of the smallest radius was half an inch wide while on the outside it was 3 inches. Thanks to the Jackcontrol® real-time monitoring system, the pipes remained without any damage and the Jackcontrol® joint design ensured the water tightness of the pipe coupling successfully.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Pipe Jacking / Microtunnelling

Citation

Cyrill Althuser, Markus Rennen (2017). Rufi Hydropower Plant - Latest Technology Enables Large Diameter Curved Microtunnel Below Railways. Paper presented at No-Dig Down Under 2017. ASTT Knowledge Library.

Sector

transport

Details

Source:
No-Dig Down Under 2017
Pages:
13
File:
PDF, 2.0 MB

One-page brief

Member companies

Corporate members delivering Pipe Jacking / Microtunnelling

J&R Contracting LimitedDirectional Drilling Open TrenchingWCWaipa Civil3 waters trenchless and open cut 3 waters.OptionX Group
See all 58 members delivering Pipe Jacking / Microtunnelling →