Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Right first time - the German approach to quality assurance of cured in place pipe (CIPP) lining of sewers Iain A Naismith
Library
MembersPaper2025

Right first time - the German approach to quality assurance of cured in place pipe (CIPP) lining of sewers Iain A Naismith

Iain Naismith

Abstract

This paper explains the development of Quality Assurance approaches to Cured in Place Pipe (CIPP) lining for gravity and pressure sewers, evolved over past 25 years with German sewer network owners, by the not-forprofit IKT – Institute for Underground Infrastructure. It particularly highlights where publicly available reports on the findings can be accessed. In the early 2000s, at the request of sewer network owners, IKT excavated and examined sections of CIPP lined sewers, concluding that most of the abnormalities/defects observed related to installation issues and highlighting the importance of quality assurance. This led to the examination of samples from hundreds of new installations using short-term tests and the subsequent publishing of annual reports on the results of this testing. Research then extended to comparing the performance of rehabilitation and repair techniques for lateral sewers, lateral connections, manholes and pressure sewers, using test rigs at the one-to-one scale comprising sewers with simulated damage scenarios selected by the network owners. Each of these projects resulted in recommendations for application of quality assurance by sewer network owners in procurement, during installation and post installation to enable right first-time CIPP installations. The paper also highlights current international research on CIPP in larger diameter sewers being undertaken by IKT, that Water Agencies are participating in with Water Services Association of Australia.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Cured-in-Place Pipe (CIPP)

Citation

Iain Naismith (2025). Right first time - the German approach to quality assurance of cured in place pipe (CIPP) lining of sewers Iain A Naismith. Paper presented at No-Dig Down Under 2025. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2025
Pages:
10
File:
PDF, 467 KB

One-page brief

Member companies

Corporate members delivering Cured-in-Place Pipe (CIPP)

WCWaipa Civil3 waters trenchless and open cut 3 waters.WNZWSP New Zealand LtdFrom mountains to sea, our water experts design innovative solutions and train our industry to deliver sustainable solutions and enhance the health of water across New Zealand.Underground ExpertsRelining works
See all 29 members delivering Cured-in-Place Pipe (CIPP) →