Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Relocating the Dufferin Sanitary Trunk Sewer from under the G. Ross Lord Reservoir
Library
MembersPaper2025

Relocating the Dufferin Sanitary Trunk Sewer from under the G. Ross Lord Reservoir

Matthew Devitt, Erez Allouche, Naomi Latimer, Mike Dekhil

Abstract

Inflow and infiltration (I&I) are a common problem faced by municipalities regarding their gravity sewer collection systems, as well as the burden the additional flow has on downstream treatment facilities. I&I is typically from groundwater around the pipe, but for the Dufferin Sanitary Trunk Sewer (STS), the G. Ross Lord Reservoir is located directly above the STS with a storage capacity of 5,000,000 m3 . The reservoir is north of Finch Avenue and west of Dufferin Street, major thoroughfares in Toronto, and is fed by the Don River. The existing Dufferin STS itself runs along the west bank of the river, under the reservoir and earthen dam, eastward where it connects to the West Don STS. In 2010/11, the Dufferin STS was inspected, and active degradation was noted with significant I&I issues under the existing surface watercourse and the reservoir. The preferred approach to address the deterioration and significant I&I was a combination of realignment using HDPE lined, 1,200 mm diameter reinforced concrete jacking pipe microtunnel around the reservoir and dam, and CIPP lining of the STS sections to remain-in-service outside the reservoir footprint. Construction for this work started in 2023 and was substantially completed in the summer of 2025. This paper will discuss the design and construction of the project, including challenges encountered during construction associated with deep shafts (up to 22 m in depth) located in a highly permeable formation beneath the groundwater table, challenging surface conditions, traffic management, and climate change, and how these challenges were addressed by the contractor and design team.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Matthew Devitt, Erez Allouche, Naomi Latimer, Mike Dekhil (2025). Relocating the Dufferin Sanitary Trunk Sewer from under the G. Ross Lord Reservoir. International No-Dig 2025 Vancouver. ASTT Knowledge Library.

Sector

water

Details

Source:
International No-Dig 2025 Vancouver
Pages:
14
File:
PDF, 3.5 MB

One-page brief