Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Rehabilitation of Large Diameter Pressure Water Mains in Hong Kong – a Case Study
Library
MembersCase study2015

Rehabilitation of Large Diameter Pressure Water Mains in Hong Kong – a Case Study

Tony Lau, Gary Lee, Faye Qiao, Jinsong Wang

Abstract

Repair of large diameter pressure water mains is always a big challenge. In Hong Kong, a large diameter pressure water main is usually a trunk main serving a big area with a large group of people in a large region and is usually laid under busy roads. Such conditions impose many constraints to the related pipe repair project, such as limited pipe shut down period and limited space for access pits. The cost of repair is usually very high. This paper presents a project of Water Supplies Department of Hong Kong in which about 30km of Dongjiang mains and 11km of mains along Fan Kam Road are rehabilitated. It discusses the project constraints encountered along different parts of the pipeline, followed by how suitable on-line rehabilitation methods are selected. This paper then describes the method of Hand Applied Fibre Reinforced Plastic (FRP) Lining, which is one of the major on-line rehabilitation methods adopted in this project. This lining is formed by building up FRP sheets in layers and allows the optimization of using semi-structural lining and fully structural lining at different locations along the pipeline and hence saving is achieved.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Tony Lau, Gary Lee, Faye Qiao, Jinsong Wang (2015). Rehabilitation of Large Diameter Pressure Water Mains in Hong Kong – a Case Study. Paper presented at No-Dig Down Under 2015. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2015
Pages:
7
File:
PDF, 1.0 MB

One-page brief