Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Orakei Main Sewer Rehabilitation
Library
MembersPaper2015

Orakei Main Sewer Rehabilitation

urice Lubbock / Warwick Brown

Abstract

The Orakei Main Sewer, varying in size from 525mm circular to 2.4m x 1.5m egg shape, was originally constructed in 1910, and runs from Avondale, via Herne Bay and onwards to Hobson Bay, a total of over 8 km. A 250m section of egg shaped concrete block construction 2.4m x 1.5m runs under the Stanley St motorway on ramp, through the Auckland Domain, and under the ASB tennis centre. Until the Central Interceptor comes on stream, starting in the mid 2020s, this sewer will continue to be a critical and essential component of Auckland’s sewer network. Following extensive investigation, it was found that the structural integrity of the crown arch had become compromised due to biogenic corrosion and root intrusion, and that it had reached a level where structural repairs could not be deferred without incurring unacceptable risk. After design and tendering, a project was undertaken to install 150m of glass reinforced lining segments and a further 100m of CAC mortar lining where the condition of the main sewer was of greatest concern. To carry out the lining works, a temporary pump station and rising main were built, to divert flows of up to 800 l/sec. This 12 month project was successfully completed without incident in July 2014.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

urice Lubbock / Warwick Brown (2015). Orakei Main Sewer Rehabilitation. Paper presented at No-Dig Down Under 2015. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2015
Pages:
10
File:
PDF, 1.4 MB

One-page brief