Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /New standards for testing and certifying cured-in-place pipe (CIPP) as watertight
Library
MembersPaper2019

New standards for testing and certifying cured-in-place pipe (CIPP) as watertight

Chuck Hansen

Abstract

The use of Cured-In-Place Pipe (CIPP) and other trenchless lining solutions have been an accepted method for pipe rehabilitation for over 40 years. Despite the requirement to submit sample pieces of liners or coupons with final video files from high resolution Closed-Circuit Television (CCTV) cameras, a growing number of CIPP lining projects in North American, Europe, and the Middles East have been experiencing liner failures and leaks, before warranty expiration. While most CIPP testing has been limited to simple visual inspection, a number of academic and consulting engineers have sought alternative testing methods to ensure that gravity (sewer) & pressurised pipe (water) liners are watertight, even after lateral reinstatements. One such testing standard gaining rapid adoption has been ASTM F2550, Standard Practice for Locating Leaks Using the Variation of Electric Current Flow Through the Pipe Wall. Similar to holiday testing of protective coatings, low voltage conductivity or Focused Electrode Leak Location (FELL) is recommended as an alternate to visual inspection due to its unbiased results and ability to find and quantify leaks in full-length, 360-degree pipes, in minutes. This paper presents new inspection, testing, and acceptance standards for CIPP and other pipe mate-rials. Oftentimes visually accepted by CCTV cameras, substandard trenchless materials, poor installation, and uneven curing leads to CIPP having accelerant burns, accidental cuts, bad service reconnections, blisters, delamination, damage from equipment, embedded foreign objects, pinholes, overcooking, stretching, wet-out failures, and wrinkles, including buckling, fins, folds, & ridges. This paper discusses case studies from working with WRc plc (Swindon, England), research undertaken with IKT (Gelsenkirchen, Germany), and North American projects, included measuring ‘same-day’ CIPP rehabilitation effectiveness.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Cured-in-Place Pipe (CIPP)

Citation

Chuck Hansen (2019). New standards for testing and certifying cured-in-place pipe (CIPP) as watertight. Paper presented at No-Dig Down Under 2019. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2019
Pages:
10
File:
PDF, 9.7 MB

One-page brief

Member companies

Corporate members delivering Cured-in-Place Pipe (CIPP)

Underground ExpertsRelining worksWNZWSP New Zealand LtdFrom mountains to sea, our water experts design innovative solutions and train our industry to deliver sustainable solutions and enhance the health of water across New Zealand.Systra ANZSystra are underground engineers providing multi-disciplinary services to the transport, infrastructure, energy, utilities and mining sectors. We bring confidence to significant project decisions in a challenging delivery environment. In the trenchless space our services encompass consulting, client
See all 29 members delivering Cured-in-Place Pipe (CIPP) →