Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /MTBM VS Sheet pile, battle for the ages
Library
MembersPaper2023

MTBM VS Sheet pile, battle for the ages

Jiang Aizezi, Kit Chapman

Abstract

Thornlie - Cockburn Link (TCL) project, consists of new railway line between the Armadale and Mandurah lines via the Thornlie and Cockburn Stations. The track extension from Thornlie to Cockburn is approximately 14.50 km consisting of narrow gauge 1067mm ballasted (at grade) and slab track (in tunnels and dives) permanent way. As a part of the TCL project, the BP Kewdale White Oil Line (a BP asset known as KWOL) required relocation to make way for the construction for the remainder of the project. A component of this relocation required a microtunnel (or Thrust Bore) crossing below the Public Transport Authority's (PTA) of WA Thornlie passenger railway line and the Arc Infrastructure freight railway line – between Thornlie Station and Canning River. In December 2021, during construction of the microtunnel, the MTBM (Micro Tunnel Boring Machine) hit an unknown obstruction ceasing tunnelling operations. Upon investigation this obstruction was found to be a temporary works (sheet pile) used to retain the Arc freight rail during construction of the PTA Thornlie Line railway bridge crossing Canning River in 2004. As there were no suitable re-design options available, and after multiple recovery options were explored, it was decided in PTA’s Disruption Access Meeting team that the best available opportunity to recovery the MTBM was to take possession of the rail and recover the MTBM during the Easter 2022 period (14 April 2022 to 19 April 2022). This paper is a case study about this issue encountered and recovery worked carried out.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Pipe Jacking / Microtunnelling

Citation

Jiang Aizezi, Kit Chapman (2023). MTBM VS Sheet pile, battle for the ages. Paper presented at No-Dig Down Under 2023. ASTT Knowledge Library.

Sector

transport

Details

Source:
No-Dig Down Under 2023
Pages:
15
File:
PDF, 490 KB

One-page brief

Member companies

Corporate members delivering Pipe Jacking / Microtunnelling

Tunnelling SolutionsAlthough our main area is Open Face Tunnelling we have highly experienced personnel in the Pipe Jacking/Micro Tunnelling Sector.IplexManufacture and supply of plastic pipeline systems. This includes PVC, PE, PP and GRP pipelines ranging from 15 mm to 3000 mm for applications across water supply, sewerage, stormwater, irrigation, plumbing, mining, gas, industrial, telecommunications and electrical infrastructure.WCWaipa Civil3 waters trenchless and open cut 3 waters.
See all 58 members delivering Pipe Jacking / Microtunnelling →