Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Microtunneling on a British Army Base in Gütersloh, Germany
Library
MembersPaper2015

Microtunneling on a British Army Base in Gütersloh, Germany

John Milligan, Benny Melse

Abstract

On the British Army base in Gütersloh, Germany, the basements were regularly flooding due to the high groundwater table. When the base was originally constructed, industries in the area were booming and the groundwater was used for cooling purposes, keeping the water table at an artificial level. As the manufacturers in the area made changes to their processes, the water usage diminished and the watertable rose significantly. Water was now infiltrating the basements of the facilities on the base. To address the issue, a drainage system under and around a building was designed to eliminate water infiltration. The requirements included pinpoint accuracy, so a guided boring system was specified for the project. The combination of confined workspaces, depth of installation and ground conditions brought the engineering company Redeker and the contractor Beermann Borhtechnik to select vacuum microtunneling as the preferred method for the project. The project required nine bores for a combined distance of 225 m (738.2’) from three launch pits. Two pits would accommodate two drives each, and five bores would be launched from the third. Using a pullback technique, 1.95 m (6.4’) perforated pipe sections were installed following the pilot bore. All nine bores were completed in six consecutive working days. Paper 1.1 - 1

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Pipe Jacking / Microtunnelling

Citation

John Milligan, Benny Melse (2015). Microtunneling on a British Army Base in Gütersloh, Germany. Paper presented at No-Dig Down Under 2015. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2015
Pages:
9
File:
PDF, 730 KB

One-page brief

Member companies

Corporate members delivering Pipe Jacking / Microtunnelling

WCWitt ConsultingTunnel design and rehabilitation specialistsOptionX GroupIplexManufacture and supply of plastic pipeline systems. This includes PVC, PE, PP and GRP pipelines ranging from 15 mm to 3000 mm for applications across water supply, sewerage, stormwater, irrigation, plumbing, mining, gas, industrial, telecommunications and electrical infrastructure.
See all 58 members delivering Pipe Jacking / Microtunnelling →