Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Micro-tunnelling in congested urban areas: A case study of level crossing removal project
Library
MembersCase study2023

Micro-tunnelling in congested urban areas: A case study of level crossing removal project

Ananthakrishna Nagesh, Bing Lee

Abstract

This paper presents a case study for a 275m length pipe-jacked concrete sewer line, installed under an existing road using trenchless techniques as part of level crossing removal works in Melbourne, Victoria. Due to high vehicular traffic in the area and to avoid congestion, micro-tunnelling was chosen as a suitable method for laying the pipe. Based on borehole data and seismic survey information, the tunnel was predominantly installed through a geological interface containing residual soils and weathered volcanic basalt where core stones or ‘floaters’ could be present. Based on the ground conditions and a risk and cost benefit assessment undertaken by the Client and microtunnelling contractor, an Earth Pressure Balanced (EPB) TBM method was selected. The launch shaft was designed to retain lateral earth pressure using a trench box. A conventional thrust block was constructed to facilitate pipe jacking. The location of the shaft was just 2m from the edge of an existing building. To mitigate risk and to ensure the performance was within the design requirements, soil-structure interaction analysis of the launch shaft was undertaken to predict building settlement and conduct an impact assessment. During pipe jacking works, ground monitoring was carried out at regular intervals along the drive, at the shaft location and along the building edge. The roof awning of the existing building was modified to accommodate the launch shaft and reinstated to the original configuration after pipe jacking works were completed. This paper provides insights into the design and construction challenges of microtunnelling projects in dense urban environments containing high traffic and nearby buildings.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Pipe Jacking / Microtunnelling

Citation

Ananthakrishna Nagesh, Bing Lee (2023). Micro-tunnelling in congested urban areas: A case study of level crossing removal project. Paper presented at No-Dig Down Under 2023. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2023
Pages:
10
File:
PDF, 259 KB

One-page brief

Member companies

Corporate members delivering Pipe Jacking / Microtunnelling

Herrenknecht AGTBM tunnelling, pipe jacking and pipeline constructionUtilities InfrastructureDirectional Drilling Pipe Ramming Hydro Excavation Pipe bursting PE WeldingSystra ANZSystra are underground engineers providing multi-disciplinary services to the transport, infrastructure, energy, utilities and mining sectors. We bring confidence to significant project decisions in a challenging delivery environment. In the trenchless space our services encompass consulting, client
See all 58 members delivering Pipe Jacking / Microtunnelling →