Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Lessons Learned from the CIPP Lining of a 72-inch Sewer Interceptor Amidst Wetlands and Landfills
Library
MembersPaper2025

Lessons Learned from the CIPP Lining of a 72-inch Sewer Interceptor Amidst Wetlands and Landfills

Samantha Daigle

Abstract

The City of Palo Alto (City) owns, operates, and maintains the 72-inch RCP gravity Joint Intercepting Sewer (JIS). Originally constructed in 1972, the 9,000-foot long JIS is the main sanitary sewer transmission system to the Regional Water Quality Control Plant (Plant), conveying more than half of the Plant’s influent flow. Following a condition assessment in 2020, the City determined that approximately 2,400 feet of the JIS pipeline immediately upstream of the Plant’s headworks required urgent rehabilitation. The JIS is buried 25 feet deep beneath a public trail adjacent to Byxbee Park and the Baylands Nature Preserve along the South San Francisco Bay shoreline. The park and shoreline include a heavily used hiking network, including a trail over this portion of the JIS. Additionally, Byxbee Park is constructed on a closed landfill, and active leachate pumping is discharged to the JIS. The JIS is also close to a wetland, home to protected migratory birds, foxes and other wildlife treasured by the regional community. The JIS rehabilitation design used cured-in-place pipe (CIPP) lining and non-structural rehabilitation of three maintenance holes originally planned for completion in 2024. Several construction challenges resulted in the project being delayed, and planning to finalize construction in 2025. This paper highlights construction challenges and lessons learned that resulted in the successful rehabilitation of the downstream portion of the JIS.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Samantha Daigle (2025). Lessons Learned from the CIPP Lining of a 72-inch Sewer Interceptor Amidst Wetlands and Landfills. International No-Dig 2025 Vancouver. ASTT Knowledge Library.

Sector

water

Details

Source:
International No-Dig 2025 Vancouver
Pages:
10
File:
PDF, 1.5 MB

One-page brief