Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Large Trunk Sewer Siltation Headaches; Working Towards a Cure
Library
MembersPaper2019

Large Trunk Sewer Siltation Headaches; Working Towards a Cure

Shariff Shockair

Abstract

For decades water authorities around Australia have struggled with managing siltation problems in large trunk sewers (>3m diameter), and the difficulties in removing silt from these critical sewers whilst they are in operation at nearly peak capacity with difficult access and limited means for diverting flows. This was a problem experienced by Sydney’s Northern Suburbs Ocean Outfall Sewer (NSOOS) that demanded a solution to avoid dry weather overflows caused by loss of capacity from siltation. A collaborative arrangement was developed between Sydney Water, SASTTI and experienced delivery contractors to tackle the problem. This led to the development of three new innovative technologies to remove silt under different live sewer conditions that are currently being employed successfully to remove siltation. This paper traces the path by which these technologies came to fruition, provides the basic details of the technologies and the conditions under which they operate and explains how they can be employed to address similar problems elsewhere in Australia. The paper demonstrates how the collaborative working arrangement used for this project can be employed to tackle similar difficult problems that appears have no available solutions.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Shariff Shockair (2019). Large Trunk Sewer Siltation Headaches; Working Towards a Cure. Paper presented at No-Dig Down Under 2019. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2019
Pages:
8
File:
PDF, 2.3 MB

One-page brief