Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Jansz IO Project
Library
MembersPaper2025

Jansz IO Project

Abstract

The Jansz IO HDD Project is one of the largest Horizontal Directional Drilling (HDD) projects completed in Australasia. Completed between 2021 to 2025, it presented challenges throughout the planning and execution process. This project consisted of the new installation of 3x 600m DN630 HDPE conduits for Chevron Australia as part of the Jansz IO Subsea Compression Project and Barrow Island Umbilical Project (BUP). From the initial stages of the project, constraints were identified with the mobilisation and planning due to the classification of Barrow Island as a Class A Nature Reserve. Additionally, the geotechnical composition of the ground was highly fractured with frequent and significant changes in composition, along with full losses of drilling fluid. The experienced drilling conditions deviated from the interpolated borehole data leading to challenges with steering and installation. This paper will provide a summary of the challenges experienced and the actions taken, along with their effectiveness, when drilling in such challenging conditions. The project resulted in successful installation of two of the critical casings for gas plant continuation and subsea connection, and one abandoned installation. This paper will provide an insight into working in some of the most challenging HDD conditions experienced in Australia, and cover the lessons learnt and improvements from engineering to construction. 1 No-Dig Down Under 2025 Jansz IO Project Rutherford, John

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

(2025). Jansz IO Project. Paper presented at No-Dig Down Under 2025. ASTT Knowledge Library.

Details

Source:
No-Dig Down Under 2025
Pages:
15