Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Its Big, Critical and Has Vacuum Issues, Can It Be Rehabilitated? Seattle DN1200 Sewer Forcemain Rehabilitation Story
Library
MembersPaper2023

Its Big, Critical and Has Vacuum Issues, Can It Be Rehabilitated? Seattle DN1200 Sewer Forcemain Rehabilitation Story

Matthew Tooley

Abstract

This paper explores the unique performance parameters of a pressure sewer rehabilitation that experiences significant vacuum conditions, the current available alternatives, their limitations and what the rehabilitation manufacturers offer versus what the industry has installed. Pipeline rehabilitation is a common industry practice for gravity systems and small diameter pressure applications. What makes this project unique is the size, design pressures parameters, and internal diameter constraints for a critical asset, leading to the need for a rehabilitation alternative with a proven track record. King County’s Interbay force main sewer, in Seattle USA, was constructed in 1966-67 and consists of 840m of dual DN1200 reinforced concrete pipes (RCP) between the Interbay Pump Station and the Discharge Structure, with an overall rated capacity of 5.8m3/s. The station collects sewage from the majority of Seattle and a failure would result in significant overflows into the Puget Sound. Inspections of the force mains indicate a remaining service life of 10- 20 years, leading to the need for rehabilitation to meet an extended service life of 50 years. The system pressures include an operating head of 8.5m, shut of head of 27m with a negative surge pressure of - 6.3m. The site poses significant challenges including a short summer construction period, tidal groundwater, historical landfill, adjacent railroad, adjacent armory, works underneath a freeway bridge and the need to keep a single main online at-all-times. The alternatives considered: • Geopolymer • Nonstructural and Structural CIPP Hot Water Cure • Structural CIPP UV Cure • Sliplining • Tight-fit Sliplining • Spiral Wound Pipe Alternatives were evaluated on a range of technical performance requirements, focusing on hydraulic ability to meet the required minimum internal diameter and maximum and minimum pressures. The refined CIPP alternatives were further compared against available resin alternatives considering their performance capabilities, environmental impacts, historical cure performance and the current manufacturer endorsements versus proven installed track record. 1 No-Dig Down Under 2023 Seattle DN1200 Sewer Forcemain Rehabilitation Story Matthew Tooley, Stephen Lindsey

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Matthew Tooley (2023). Its Big, Critical and Has Vacuum Issues, Can It Be Rehabilitated? Seattle DN1200 Sewer Forcemain Rehabilitation Story. Paper presented at No-Dig Down Under 2023. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2023
Pages:
10
File:
PDF, 205 KB

One-page brief