Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /How municipalities use LED light-cured CIPP technology to prioritize scheduling and budgeting of residential and commercial sewer rehabilitation.
Library
MembersPaper2025

How municipalities use LED light-cured CIPP technology to prioritize scheduling and budgeting of residential and commercial sewer rehabilitation.

Tony Kovacevic, Michael O’Toole

Abstract

Municipalities find that self-performing wastewater infrastructure repair and renovation projects significantly increases flexibility both in budgeting and in scheduling. LED light-cured CIPP lining technology contributes greatly to that capability. The method is fast, requires relatively low capital outlay and is easy for crews to learn and use. Projects that crews identify during routine inspections are quickly remedied and no longer jeopardize completion of other, scheduled work. Since the projects are now completed inhouse, they are neither subject to delays imposed by a time-consuming bidding process nor vulnerable to unforeseen conflicts that can arise in a private contractor’s own schedule. This presentation focuses on the City of Burnaby in British Columbia, Canada. The city’s wastewater department has been self-performing LED light-cured CIPP lining rehabilitation of 4- and 6-inch service laterals since 2020. The case study demonstrates how the city has used the technique to overcome a backlog and meet repeated surges in demand in a burgeoning housing reconstruction market. The technology has proved so successful that the city now has a dedicated CIPP crew and is expanding its use now to 8- and 10-inch pipes of catch basin and mainline projects. The presentation includes key insights regarding how the city successfully introduced and implemented a now well-proven method which, depending on the region, may yet be unfamiliar to some municipalities and their crews.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Tony Kovacevic, Michael O’Toole (2025). How municipalities use LED light-cured CIPP technology to prioritize scheduling and budgeting of residential and commercial sewer rehabilitation.. International No-Dig 2025 Vancouver. ASTT Knowledge Library.

Sector

water

Details

Source:
International No-Dig 2025 Vancouver
Pages:
4
File:
PDF, 407 KB

One-page brief