Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /HDD Installation of Pressure Sewer Pipeline in Mine Subsidence Areas
Library
MembersPaper2015

HDD Installation of Pressure Sewer Pipeline in Mine Subsidence Areas

Saviz Gharavi, Maz Mahzari

Abstract

In this study, impacts of mine subsidence on the structural and hydraulic performance of polyethylene pipe in pressure sewer applications were investigated. Structural safety of PE pipe against mine subsidence was investigated and different design safety factors were considered for different methods of installation. For installation of pipelines both trenchless, particularly horizontal directional drilling, and open trench were utilised. A numerical simulation considering pipe-structure interaction effects is employed to estimate the stresses due to mine subsidence. Ground condition, pipe material properties and subsidence parameters were used as input to the numerical structural analysis. Estimated stresses are then checked and verified against allowable stresses given by “AS/NZS 4130:2009 Polyethylene (PE) pipes for pressure applications”. This study showed the induced mine subsidence stress can reduce the nominal internal pressure capacity of polyethylene pipe material. For instance, a PE100 PN16 pressure rating pipe has a standard dimensional ratio (SDR) in order to safely performing with an internal pressure of 1.6 MPa. In general, the SDR calculation is purely based upon on hoop stresses; however induced longitudinal stresses from mine subsidence can change the stress pattern in the pipe which would not allow the PE pipe to fully utilising its nominal internal pressure. This reduction is called capping reduction which is dependant to a number of factors such as pipe size, SDR rating, method of installation (HDD, or open trench). Outcome of this study showed that the capping reduction is very dependant to the type of installation and can vary between 28%-35% of nominal pressure rating of pipe.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Horizontal Directional Drilling (HDD)

Citation

Saviz Gharavi, Maz Mahzari (2015). HDD Installation of Pressure Sewer Pipeline in Mine Subsidence Areas. Paper presented at No-Dig Down Under 2015. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2015
Pages:
9
File:
PDF, 986 KB

One-page brief

Member companies

Corporate members delivering Horizontal Directional Drilling (HDD)

WNZWSP New Zealand LtdFrom mountains to sea, our water experts design innovative solutions and train our industry to deliver sustainable solutions and enhance the health of water across New Zealand.WCWaipa Civil3 waters trenchless and open cut 3 waters.WCWitt ConsultingTunnel design and rehabilitation specialists
See all 64 members delivering Horizontal Directional Drilling (HDD) →