Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Guided Auger Boring in All Ground Conditions
Library
MembersPaper2023

Guided Auger Boring in All Ground Conditions

Dr. Heinz Plum

Abstract

Guided Auger Boring is a trenchless method for accurately (+-25 mm) installing pipes in the ground. There are two different categories of guided auger boring: the Pilot Pipe method for displaceable soils and the Front Steer Method for harder ground and rock. These two methods are different solutions for different ground conditions. The pilot pipe method is limited to ground conditions with SPT values less than or equal to 35, with no cobbles bigger than 80 mm and a drive length less than 100 m. If the ground is not displaceable or if the ground is soft and hard rock then choice would be to switch to the Front Steer system. With the Front Steer system the ground is immediately excavated by the cutting head, removed by the augers and any correcting of the drilling direction is done by the outer steering pipe of the Front Steer. The sizes of the Front Steer system reach from 324 mm OD up to 1.014 mm OD. It can handle soils, soft rock up to 30 MPa and equipped with DTH hammer hard rock up to 250 MPa. With both methods the pilot pipe method and the Front Steer method it is now possible to install small diameter lines in all ground conditions. Even sewer systems with small diameter lines using concrete, GRP, clay or plastic pipes can now be installed by these trenchless methods. 1 No-Dig Down Under 2023 Guided Auger Boring in All Ground Conditions Dr. Heinz Plum

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Auger Boring

Citation

Dr. Heinz Plum (2023). Guided Auger Boring in All Ground Conditions. Paper presented at No-Dig Down Under 2023. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2023
Pages:
13
File:
PDF, 377 KB

One-page brief

Member companies

Corporate members delivering Auger Boring

WCWaipa Civil3 waters trenchless and open cut 3 waters.J&R Contracting LimitedDirectional Drilling Open TrenchingIplexManufacture and supply of plastic pipeline systems. This includes PVC, PE, PP and GRP pipelines ranging from 15 mm to 3000 mm for applications across water supply, sewerage, stormwater, irrigation, plumbing, mining, gas, industrial, telecommunications and electrical infrastructure.
See all 37 members delivering Auger Boring →