Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Building Resilience in Our Wastewater Networks by Recommissioning Unused Assets
Library
MembersPaper2023

Building Resilience in Our Wastewater Networks by Recommissioning Unused Assets

Paul Everett, Danny Tang, Jerry Sunarho

Abstract

Under the suburb of Marrickville in Sydney’s Inner West runs three sewer rising mains. The Central and Northern mains had been taken offline due to previous failures. The Southern main remained the only operational pipeline and was itself showing signs of deterioration. Sydney Water wanted to bring the decommissioned mains back online to ensure the network had sufficient contingency should the unexpected happen. Interflow was engaged by Sydney Water to rehabilitate both the Central and Northern rising mains. Both existing rising mains were DN600 pipelines made from a mixture of both cast iron and concrete pipe. The rising mains also had both vertical and horizontal bends along the alignment. Increased development in the area, combined with proximity to underground services and train tracks, meant that access to the alignment was very limited. Interflow needed to find a solution that could be installed over longer distances between and around bends. The solution was to install Primus Line from the sewer pumping station to discharge points near Illawarra Road. Due to the inactivity of the existing pipelines, extensive cleaning and rehabilitation was needed. The works added a minimum 50-year service life to both the Central and Northern sewer rising mains, improved the system’s resilience, and will allow Sydney Water to carry out future inspection and repair on the Southern main. It also demonstrates that there are viable options available for complex pressure pipelines in high-density residential areas. 1 No-Dig Down Under 2023 Building resilience in our wastewater networks by recommissioning unused assets Paul Everett, Danny Tang, and Jerry Sunarho

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Paul Everett, Danny Tang, Jerry Sunarho (2023). Building Resilience in Our Wastewater Networks by Recommissioning Unused Assets. Paper presented at No-Dig Down Under 2023. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2023
Pages:
10
File:
PDF, 225 KB

One-page brief