Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Breaking New Ground Beneath Lake Ontario: How Collaboration and Innovation Delivered a Successful Microtunnel Drive
Library
MembersPaper2025

Breaking New Ground Beneath Lake Ontario: How Collaboration and Innovation Delivered a Successful Microtunnel Drive

Thomas Siuda, Cian McDermott

Abstract

This paper explores the design evolution and successful construction of a 1200mm diameter (1500mm OD), 190m microtunnel drive with a wet retrieval beneath Lake Ontario — a key component of the R.C. Harris Water Treatment Plant Zebra Mussel Control System for the City of Toronto. Designed by Associated Engineering and constructed by Ward & Burke in 2024, the project originally included 2.8km of 600/400mm HDPE intake pipe installed using dredging techniques within the lakebed. The alignment was to follow the existing intake pipe through traditional in-water trenching techniques and included an onshore jack and bore crossing under a storm outfall. During project re-tendering, a comprehensive marine geotechnical investigation using geophysical, sonar, magnetometer and other technologies was conducted to provide additional information for the geotechnical conditions within the lake. Ward & Burke identified and proposed an alternative approach of using microtunneling to reduce in-water and onshore disturbance as well as eliminating the jack and bore. This solution required tunneling through the existing bearing wall, beneath shoreline steel sheet piles, and executing a wet retrieval. Close collaboration between the contractor and consultant optimized the alignment and mitigated construction risks. This paper highlights the critical design decisions, innovative problem-solving, and teamwork that transformed project challenges into a groundbreaking trenchless success story under Lake Ontario.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Citation

Thomas Siuda, Cian McDermott (2025). Breaking New Ground Beneath Lake Ontario: How Collaboration and Innovation Delivered a Successful Microtunnel Drive. International No-Dig 2025 Vancouver. ASTT Knowledge Library.

Details

Source:
International No-Dig 2025 Vancouver
Pages:
6
File:
PDF, 1.1 MB

One-page brief