Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Application of CIPP Liner in Water Mains in Australia - Project Case Studies
Library
MembersCase study2019

Application of CIPP Liner in Water Mains in Australia - Project Case Studies

Ian McNab

Abstract

Infrastructure Australia has reported we lose approximately 80 litres per connection per day from our drinking water reticulation systems in Australia. At the same time many water authorities are struggling to fund adequate pipeline renewal programs. Other countries have provided evidence of the long term benefits of using structural Cured In Place Pipe (CIPP) renewal technology in drinking water pipelines. Recent projects in Australia have demonstrated the suitability of structural CIPP across different environments and with a variety of host pipes. There are a range of commercial considerations for selecting a pipeline renewal solution. However, the benefits are most likely to be achieved by effectively planning the project to reduce costs, minimize community disruption and improve the overall performance of the pipeline once renewal works are complete. Including structural CIPP as part of a renewals program can provide a cost effective way to improve water network reliability and minimise water loss.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Cured-in-Place Pipe (CIPP)

Citation

Ian McNab (2019). Application of CIPP Liner in Water Mains in Australia - Project Case Studies. Paper presented at No-Dig Down Under 2019. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2019
Pages:
7
File:
PDF, 996 KB

One-page brief

Member companies

Corporate members delivering Cured-in-Place Pipe (CIPP)

WCWaipa Civil3 waters trenchless and open cut 3 waters.Underground ExpertsRelining worksSystra ANZSystra are underground engineers providing multi-disciplinary services to the transport, infrastructure, energy, utilities and mining sectors. We bring confidence to significant project decisions in a challenging delivery environment. In the trenchless space our services encompass consulting, client
See all 29 members delivering Cured-in-Place Pipe (CIPP) →