Australasian Society for Trenchless Technology
Library
Corporate membersNewsEvents
ASTT

Library

Browse the libraryTechniques A–ZAsk ASTTCorporate membersNewsEvents

ASTT

About ASTTCouncilMembershipStrategic PlanFAQContact
ASTT — Australasian Society for Trenchless Technology

The Australasian Society for Trenchless Technology — the peak industry body for trenchless engineering across Australia and New Zealand.

Regional affiliate of the ISTT

PO Box 2242, Malaga LPO WA 6944, Australia

+61 (0) 419 918 449

secretary@astt.com.au

Explore

  • Knowledge library
  • Ask ASTT
  • Corporate members
  • News
  • Events

ASTT

  • About
  • Council
  • Contact
  • Help
  • ISTT
  • Cookie preferences
© 2026 Australasian Society for Trenchless TechnologyDeveloped byEventMagix
  1. Home
  2. /Knowledge library
  3. /Adjusting the Donvale Branch Sewer Design to Achieve a Successful 470m Long HDD Bore
Library
MembersPaper2019

Adjusting the Donvale Branch Sewer Design to Achieve a Successful 470m Long HDD Bore

Dean Anderson

Abstract

Donvale is an established suburb on Melbourne's north-eastern urban fringe and when the area developed in the 1950’s, the undulating topography and high cost to construct sewers meant that 1,200 properties were not sewered. By late 2017, Yarra Valley Water were two years into the project to construct the 4km long Donvale Branch Sewer; the backbone of a much wider project to take these properties off aging septic tank systems and onto a sustainable sewerage solution. Micro-tunneling methods were being used to construct the sewer, but challenging ground conditions experienced during construction, combined with an even more challenging section of the project still to be built, caused Yarra Valley Water to rethink its approach and relocate a 470m long section of the design out of customers’ properties and into the nearby road reserve. This paper explores how experiences gained from nearby challenging ground conditions were used to adjust the sewer design and how this decision greatly reduced the impact of the project to private properties by paving the way for this section to be constructed using horizontal directional drilling in one continuous bore. This section of the 400mm diameter sewer was constructed in 2018 by AHD Trenchless and MFJ Constructions.

Full paper available to ASTT members

The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.

Sign inAbout membership

Techniques

Horizontal Directional Drilling (HDD)

Citation

Dean Anderson (2019). Adjusting the Donvale Branch Sewer Design to Achieve a Successful 470m Long HDD Bore. Paper presented at No-Dig Down Under 2019. ASTT Knowledge Library.

Sector

water

Details

Source:
No-Dig Down Under 2019
Pages:
10
File:
PDF, 4.3 MB

One-page brief

Member companies

Corporate members delivering Horizontal Directional Drilling (HDD)

Utilities InfrastructureDirectional Drilling Pipe Ramming Hydro Excavation Pipe bursting PE WeldingSystra ANZSystra are underground engineers providing multi-disciplinary services to the transport, infrastructure, energy, utilities and mining sectors. We bring confidence to significant project decisions in a challenging delivery environment. In the trenchless space our services encompass consulting, clientOCOrion ConsultingCivil Design
See all 58 members delivering Horizontal Directional Drilling (HDD) →