99 Avenue Sanitary Trunk Rehabilitation - Stage 2
Sam Saunders, Chris Lamont, Peiqian Zheng, Gary Fei
Abstract
The 99 Avenue Sanitary Trunk Rehabilitation project is a two-stage project to rehabilitate approximately 1.1 km of monolithic concrete arch-shaped sanitary trunk sewer located about 30 m below ground in Edmonton, Alberta. Stage 1 involved the construction of a ~1.6 km bypass sewer to divert flow, facilitating the Stage 2 trunk rehabilitation, which was completed in 2023 (NASTT 2023 No-Dig North Paper MM-T4-03). Stage 2 was awarded to Shanghai Construction Group (Canada) Corporation (SCG) as a design-build contract. SCG’s rehabilitation approach involved sliplining discrete segments of 950 mm span by 1400 mm rise non-circular fiberglass liner into the existing host tunnel (approximately 1200 mm span by 2000 mm rise) via worker-entry. Key challenges of the project included restricted access, which required the construction of deep working shafts; a complex upstream sewer network with high flow volumes that had to be diverted for isolation; difficulties in cleaning and inspecting the trunk; uncertain short-term structural conditions for safe worker-entry; variable deflections in the host tunnel alignment; poor invert conditions affecting liner insertion; and significant groundwater infiltration that required careful management during the annular space backfill grouting. This paper will examine the project's constraints and challenges, the rehabilitation planning and execution, the design-build team's innovations, and the lessons learned, along with recommendations for future projects.
Full paper available to ASTT members
The abstract above is open to everyone. Sign in with your ASTT membership email to open the full PDF.